- Final BRDC Implemenation Teams' Recommendation Statement on the Fate of the Four Dams on the Boardman River, 12/16/2008
- Final Breach Report
- Final Dam Engineering Report
- Final Detailed Analysis Effect on Wetlands Part 1 of 3
- Final Detailed Analysis Effect on Wetlands Part 2 of 3
- Final Detailed Analysis Effect on Wetlands Part 3 of 3
- Final Detailed Analysis of Alternatives Part 1 of 3
- Final Detailed Analysis of Alternatives Part 2 of 3
- Final Detailed Analysis of Alternatives Part 3 of 3
- Final Economic Social Analysis
- Final Economic Social Analysis Veritas
- Final Engineering Evaluation
- Final Fisheries Existing Data
- Final Fisheries Habitat
- Final Sediment Chemistry Data
- Final Terrestrial Habitats Summary Part 1 of 5
- Final Terrestrial Habitats Summary Part 2 of 5
- Final Terrestrial Habitats Summary Part 3 of 5
- Final Terrestrial Habitats Summary Part 4 of 5
- Final Terrestrial Habitats Summary Part 5 of 5
- Final Wetland Report
- Final Wildlife Report
- PowerPoint Presentation of Detailed Analysis of Alternatives including Results of Public Opinion Survey, 10/28/2008
- Safety Inspection of Brown Bridge Dam prepared by STS for the City of Traverse City, Part 1/3, 9/2008
- Safety Inspection of Brown Bridge Dam prepared by STS for the City of Traverse City, Part 2/3, 9/2008
- Safety Inspection of Brown Bridge Dam prepared by STS for the City of Traverse City, Part 3/3, 9/2008
- Safety Inspection of Union Street Dam prepared by STS for the City of Traverse City, 9/2008
- PowerPoint Presentation for Special Meetings for Public Opinion Survey, Fall 2008
- Fact Sheets for each of the six alternatives for managing the Boardman River Dams:
- Retain/repair all dams (Alternative #1)
- Retain/repair Brown Bridge and Union Street Dams, remove Boardman and Sabin Dams (Alternative #25)
- Modify all four dams (Alternative #41)
- Modify Brown Bridge and Boardman Dams, remove Sabin Dam, retain/repair Union Street Dam (Alternative #43)
- Retain/Repair Union Street Dam and Remove Brown Bridge, Boardman and Sabin Dams (Alternative #79)
- Modify Union Street Dam and Remove Sabin, Boardman and Brown Bridge Dams (Alternative #81)
- Powerpoint Presentation, August 2008: Economica and Social Analysis: Quantification of Exising Conditions
- Historic Survey and Review of the Boardman Dams
- Boardman Wetland Determination Report Part 1
- Boardman Wetland Determination Report Part 2
- Boardman Wetland Determination Report Part 3
- Sediment Report Completed April 2008
- Preliminary Engineering Evaluation of Existing Structures
- PowerPoint presentation regarding the Economic and Social baseline data
- Boardman River Fisheries Report
- PowerPoint presentation: Boardman River Riparian Zone Wildlife Assessment
- Summary of Terrestrial Habitats in the Boardman River Watershed
- Drawdown Plan for Boardman Pond
- Scope of Work dated June 30, 2008: This document outlines work items to be completed for the Engineering Feasibility Study for six alternatives including a public opinion survey.
- Scope of Work: This document outlines all of the work items in the evaluation of possible alternative futures for the Boardman River.
- Request for Qualifications: The Boardman River Dams Committee issued the RFQ to determine the interest, experience and capacities of organizations to complete the engineering and feasibility study.