Draft Scope of Work for Boardman River Dams Engineering & Feasibility Study Available for Review
The draft Scope of Work for the Engineering and Feasibility Study has been received from ECT, Inc. and is available for public review and comment until September 11, 2006. View the press release for details.
Posted by admin on August 31, 2006 at 10:05 AM